Skip over navigation
Banner
Industry
Directory Facilities Technology Transfer Economic Develop. NC BioHistory (TM)
Career
Job Search Post a Job Destination NC
News/Events
Industry News Submit News Release Calendar Submit Event CEO Reading
Patient
Clinical Trials Drug Development Resources
Education
K-12 Higher Ed BioEd Reading
About
Advertising Feedback Home
About
 Advertising
 Feedback
 Home
Quick Links
 Directory
 Job Search
 Facilities
 Calendar
 Advertising
 
Community Service Ad: Athena Partners - Eliminating women's cancers
Want to target global biotech trade media?  Use B3C newswire  services.
 
Advertising
 
Want global media exposure for your company? Visit B3C to learn how.


The ZymoGenetics "Steam Plant" 1914-18

Piling construction for Phase 1, 1914.





Phase I was constructed in 1914, a parallelogram in plan, approximately 90 feet deep, 100 feet long and 47 feet high (from street-level) containing four boilers, pumps, tanks, and generation equipment.

Piling construction for Phase 1, 1914.







Above the boilers stood two steel stacks, rising 95 feet above the roof. Brick was used on the north wall as fill-in material in anticipation of future expansion. (This would be broken out to connect the phases together after each construction).

Phase 1 construction, 1914.

Phase 1 construction, 1914.

Phase II construction, 1918.





Phase II was designed and constructed in 1918, expanding the generating capacity by adding more four boilers, an additional turbo generator, and two more stacks.

Phase II construction, 1918.

Backward | Forward

 
Email thie page to a friend. Email This Page
to a Friend
Print this page. Print This
Page
© 2012 Info.Resource, Inc. All rights reserved.
Privacy Policy . Terms of Use . Advertising

NorthCarolinaLifeScience.com is owned and published by Info.Resource, Inc.